Padel Court Systems

We provide structure and installation alternatives tailored to each padel court project.

Based in Istanbul, SMGTURK supports padel court planning and installation projects across Türkiye and international markets.

Project gallery

System Types

Installation Systems

Visit the installation systems page to review model-level technical differences and maintenance integration strategy.

Explore Installation Systems

Choose the right court system

Standard, panoramic and 360° panoramic systems differ in their support structures and sightlines. Compare the technical drawings alongside the site, intended use, operating plan and product documentation.

Plan the complete court

Foundations, anchors, structure, glass panels, fencing, playing surface and lighting should work together. Drainage and access around the court are part of the project. Existing bases must be checked before reuse.

Handover and operation

After installation, inspect the surface, joints, glass connections and perimeter. Set a maintenance schedule for cleaning, infill and connection checks, following the selected system's instructions.

Planning reference

The International Padel Federation rules define an indoor court as 10 × 20 m measured inside the enclosure and specify clear-height guidance. Confirm the chosen system, site, foundations and local requirements with the project team before construction.

Read the International Padel Federation rules

Padel Court Systems FAQ

What are the main stages of padel court construction?
Start by confirming the site dimensions and intended use. Check the base, drainage, foundations and anchors, then plan the structure, glass and fencing, playing surface and lighting for the selected system. Inspect connections and the surface before handover.
How should a site be prepared for padel court installation?
Review dimensions, access, base flatness, drainage and foundation capacity before installation. Plan electrical work, lighting and delivery access as well. Do not assume an existing tennis court or concrete base is suitable without a technical inspection.
What is the first criterion for selecting a padel court system?
Usage intensity, investment targets, and maintenance planning should be evaluated together.
What is the difference between panoramic and standard systems?
Panoramic systems prioritize visibility, while standard systems provide a balanced cost and operation profile.
Is a 360° system suitable for every project?
Not always. Site conditions, structural requirements, and operating model must be validated first.
Why is post-installation maintenance critical?
Routine maintenance protects play quality, extends court life, and lowers unplanned downtime.
What defines project delivery time?
Infrastructure readiness, selected system type, and project scope are the primary factors.

Talk to our team for the right padel court system for your project.

WhatsApp